EAS was the mechanical contractor for a new 135,000 square-foot build-out of data center and electronics lab space. EAS On Site was contracted to provide the HVAC ductwork, piping and plumbing scope. The 5200-ton Chiller Plant was built by EAS Off-Site Construction and shipped to the project site and assembled by EAS.


Product Highlights
-
80,000 SF of raised floor space
-
EAS Off Site Construction built the Chiller Plant with (4) 1,350-ton machines (3 Day One) in its High Point, NC plant
-
Order for the chiller plant was received the end of January. The Central Utility Plant shipped the last week of May, and began pushing chilled water by the second week of June
-
EAS coordinated with the MEP engineer on the design
-
EAS custom fabricated (17) nominal 75,000 CFM custom AHU’s for this project
-
EAS provided the mechanical mezzanine
-
The project was completed on an aggressive 9-month schedule
Project Details
-
(3) 1300 Ton Chillers
-
Cooling tower platform built overhead with (3) Cooling Towers
-
(4) Primary C.W. Pumps, 40HP each, 2,222 GPM
-
(3) Secondary C.W. Pumps, 100 HP, 3333 GPM each
-
(3) Condenser Water Pumps, 60 HP, 2410 GPM each
Chemical treatment -
Reverse Osmosis Machine and Atomizing Humidifier Pump Station
-
CEP walls & roof: 2” foam panel with Bone White finish; 12” structural base
-
Refrigerant evacuation system
-
Water storage tank
-
UV Sterilizer

Achieve Advanced Liquid Cooling for AI Data Racks Under One Contract
Give your project the advantage of expert planning and in-house multidisciplinary expertise through EAS Companies. With a single point of accountability across design, engineering, manufacturing, installation, and commissioning, we deliver integrated solutions built for performance and precision.
Connect with EAS Companies to partner with a reliable data center MEP contractor for your next project.