Duke Raleigh Hospital
Raleigh, NC
Overview
Duke Health performed a major expansion of its existing campus in Raleigh, North Carolina with the addition of a new Inpatient Tower and surgery department expansion. The CUP was constructed to increase capacity and redundancy of the chill water, steam and electrical genera&on systems to facilitate the expansion of the campus.
The project was managed through Robins & Morton. The engineer of record for the project was Affiliated Engineers Inc. EAS was engaged during early schema&c level design of the project to assist with design, layout and coordination of the central utility plant. EAS then transitioned into final design and construction of the project with delivery in July of 2018.


Project Highlights
-
10,080 SF chiller plant footprint comprised of (32) module sections and cooling tower platform.
-
The central utility plant was fabricated in its entirety in EAS’ High Point, NC facility.
-
EAS self-performed all installation, reconnection and startup of the CUP.
-
The central utility plant consisted of centrifugal chillers, steam boilers, cold water pumping systems, Steam System, cooling towers, air elimination components and full electrical package with emergency generator and associated gear.
Project Details
-
(4) 850 Ton Water cooled centrifugal Chillers (2) Day One (2) Future Day Two
-
(4) 2,125 GPM Cooling towers (2) Day One (2) Future Day Two
-
(3) Chilled Water Pumps, 200HP each, 3400 GPM, Concrete Inertia Base, (2) Day one (1) Future Day Two
-
(4) Condenser Water Pumps, 60HP each, 2125 GPM, Concrete Inertia Base, (2) Day One (2) Future Day Two
-
(1) Hot Water Pump, 2HP, 50 GPM,
-
Air Elimination and Expansion components
-
(5) Steam Boilers, Water Tube / Dual fuel, 250 BHP, (1) New Installed (3) Relocated from existing mechanical
space (1) Future Day Two -
Deaerator and surge tank
-
Steam system
-
(1) Heat Exchanger Package
-
Chemical Treatment system
-
Sand Filter System
-
VFDs for Pumps, Chiller and Cooling Tower
-
(1) 5000A 480V Switchboard, A and B Side
-
(2) 4000A 480V Switchboard
-
(3) 1600A 480V Branch Panelboard
-
(2) 400A 480V Branch Panelboard
-
(2) 100A 480V Branch Panelboard
-
(2) 225A 208/120V Branch Panelboard

Your One-Stop Shop for Healthcare and Hospital MEP Contractor Services
In healthcare and hospital construction, MEP systems must be designed with patient care, operational continuity, and facility performance in mind. EAS Companies delivers that level of control through an integrated approach that combines design-build expertise, off-site modular manufacturing, and coordinated on-site execution.
If you need to upgrade your hospital or medical facility's infrastructure, EAS provides a single accountable partner. Our approach helps minimize disruption to patient care, laboratory operations, and other critical services.