University of Maryland Medical
Largo, MD
Overview
EAS was brought on board as a design assist partner to work with the University of Maryland and the engineer of record in designing a complete central utility plant servicing a new 600,000 hospital serving the en&re Washington D.C. area. EAS provided a complete central u&lity plant including combined heat and power to serve all of the main plumbing, electrical and mechanical infrastructure. EAS provided a complete turnkey solution including controls package and installation of the utility plant.


Project Highlights
-
Roughly 30,000 square feet shipped in 93 main sec&ons
-
The Central Utility Plant was fabricated in its entirety in EAS’s High Point, NC Facility
-
The Central Utility Plant consisted of chilled water, hot water,
domes&c water, rainwater harvesting, 2 MW cogen plant,
medium voltage switchgear and transformers, ATS, paralleling gear, transvac system, office/fit out space and coordination for field installation of med gas, med vac and fire pump equipment
Project Details
-
(12) 535 ton Series Counterflow centrifugal chillers – (4) to be installed in the future
-
(12) 550 ton Counterflow open cooling towers – (4) to be in-
stalled in the future with cooling tower platforms and screen walls -
(12) 6,000 MBH dual fuel condensing boilers - (4) to be in-
stalled in the future -
(8) Domes&c water to water heaters from 1347 MBH to 2084 MBH
-
(4) 400 GPM centrifugal solid separators for cooling tower filtration
-
(2) Point of entry copper silver ionization systems for water purification
-
(2) Point of entry filtrations systems
-
Pumping systems for chilled water, hot water, domes&c water and domes&c pressure booster, condenser water and co-gen pumping
-
(4) Skidded tower filtration systems
-
(1) 17,200 CFM custom air handler
-
(1) 140 GPM rain water management system for tower
makeup water with 50 micron and ultraviolet filtration, cistern pumps, day tank and booster pump -
(1) Triplex water softener system
-
Open loop and chilled water treatment systems
-
(4) Bypass filtration systems at 300 microns
-
Plant conditioning
-
Complete domestic and mechanical piping systems
-
Complete controls provided by EAS which was based on an Allen Bradley redundant PLC controls system with RIO controllers and multiple HMI panels
-
(3) 1500 kva transformers, (3) 750 kva transformers
-
(4) 30 kva transformers, (3) 45 kva transformers
-
(1) 2000 KW gas CHP unit
-
(7) ATS
-
4000 Amp switchgear and 5000 Amp paralleling switchgear,
switchboards, panelboards, other distribution panels,
conduit, wiring, lighting -
Installation of all medium voltage gear
-
Turnkey installation provided by EAS

Your One-Stop Shop for Healthcare and Hospital MEP Contractor Services
In healthcare and hospital construction, MEP systems must be designed with patient care, operational continuity, and facility performance in mind. EAS Companies delivers that level of control through an integrated approach that combines design-build expertise, off-site modular manufacturing, and coordinated on-site execution.
If you need to upgrade your hospital or medical facility's infrastructure, EAS provides a single accountable partner. Our approach helps minimize disruption to patient care, laboratory operations, and other critical services.