Toyota Battery Manufacturing
Liberty, NC
Overview
EAS was the mechanical contractor for Toyota Battery Manufacturing North Carolina – Buildings 801 & 802 project in Liberty, North Carolina. EAS worked with Engineer, Owner and other key trade partners to provide Pre-Construction Design, Full BIM Modeling and coordination and competition of mechanical scope of work. As part of the IPD process, EAS worked to identify cost saving measures to reduce project budget. schedule, off site construction, alternate materials, and labor savings.


Project Details
14 Month Schedule per Building
-
Mechanical, Sheetmetal Pre-Fab Pipe Racks, Pro
Press -
(18) Air Cooled Chiller & (9) Water Cooled Chillers
-
(145) Supply & Exhaust Fans
-
(40) Wet & Dry Dust Collection Systems
-
Glycol Chilled & Hot Water Skid, Glycol Feeder Skid.
-
(43) Air Handling Units, (24) Heat Recovery Units
-
(102) Packaged Rooftop Units, (48) Hot Water
-
Reheat Coils, (3) Cooling Towers, (16) Process Exhaust Stacks
-
Multiple Pipe Racks per floor
-
81,000’ of Pipe
-
900,000 lbs of Duct
Everything You Need for Mission-Critical Mechanical Solutions
Advanced manufacturing facilities rely on complex MEP systems to sustain steady production. As your industrial HVAC and MEP contractor and semiconductor fab MEP provider, we build modular systems that fit directly into your layout without halting facility operations.
Contact us today to schedule a consultation and plan your mechanical infrastructure project.