Design-Assist / Design-Build

EAS delivers best-in-class results on some of the industry’s most technically demanding projects through a collaborative, integrated approach. By engaging key design and trade partners early in the preliminary design phase, our Design-Assist / Design-Build process drives consistency, predictability, and performance from concept through commissioning.

What is Design-Assist / Design-Build?

Design-Assist / Design-Build is a delivery model centered on early partnership and shared accountability. EAS joins the project team during design development to align the mechanical scope, cost, and constructability. Through collaborative modeling, prefabrication, and precise coordination, we streamline design decisions, accelerate installation, and eliminate surprises in the field.

​

Our goal: Increase predictability with the team, cost, and schedule; delivering certainty where it matters most.

BIM 2.JPG

Featured Project: Confidential Pharmaceutical Client

EAS was the mechanical contractor for this leading confidential pharmaceutical client and a member of the IPD project team.  EAS worked with engineer, owner and other key trade partners to provide pre-construction design, Full BIM modeling and coordination and competition of mechanical scope of work.  As part of the IPD process, EAS worked to identify cost saving measures to reduce project budget. schedule, off-site construction, alternate materials, and labor savings. 

Benefits

Predictability and Control

Increase schedule and cost certainty through early team alignment.

Coordinated Delivery

Coordinate and build the facility to eliminate field conflicts and errors.

Commissioning Alignment

​Align design activities with commissioning and acceptance milestones to ensure a smooth handoff.

Increased Productivity

Provide coordination drawings with greater detail to maximize prefabrication and reduce field rework.

Enhanced Performance
Improve quality, cost effectiveness, schedule responsiveness, and overall project knowledge.

The EAS Difference

For more than 70 years, EAS has advanced the standard of mechanical contracting through precision, partnership, and innovation.


Our integrated Design-Assist / Design-Build model transforms complexity into certainty, engineering productivity and predictability into every phase of delivery.